Electromechanical equipment of No. 8 lifting stations built along the protection embankments in the municipalities of Lessolo, Fiorano, Banchette, Salerano, Pavone, and Montalto Dora with No. 2 submersible electric pumps capable of guaranteeing a total flow rate of 700 l/s, including adjustments to the existing piping, installation of hydraulic equipment, and electrical panels powered by generator sets.
As part of the work, some extraordinary maintenance work on the existing protective embankments is planned.